• icon
    Solar panels
  • icon
    Battery storage
  • icon
    EV Charger

Educational campus solar installation

  • Client info
    On site
  • System size
    Full time
  • Completion
    $90K – $130K

Project overview

This project involved deploying a large-scale solar photovoltaic (PV) system across the rooftops of multiple buildings within an educational campus. The goal was to reduce the campus’s electricity costs, promote sustainability.

case-study-image

Challenges

The system included 250 high-efficiency solar panels with a total capacity of 125 kW, central inverters, and an advanced energy management system to monitor performance and optimize energy usage administrative facilities.

  • High Energy Demand & Load Management

  • Minimizing Disruption

  • Shading & Environmental Factors

  • Integration with Existing Infrastructure

case-study-image

Solution

Central inverters were paired with battery storage systems to optimize energy use during peak campus hours and provide backup power. Installation was scheduled in phases during off-peak hours to ensure minimal disruption.

Results

Prevented approximately 120 tons of CO₂ emissions each year, reinforcing the institution’s sustainability commitments. Real-time monitoring enabled facilities management to optimize energy usage and detect maintenance needs early.

Client feedback

The solar installation team delivered a highly professional, efficient, and well-organized project. The phased approach ensured our campus activities were never disrupted has significantly reduced our electricity costs.

Create a free website with Framer, the website builder loved by startups, designers and agencies.